


PET mobilised for job, phased quality checks and restoration of environment impacts prior to demobilisation


Seismic Data QA/QC
PreSeismic data acquisition feasibility study, survey Preplot design and logistic planning. Work out optimum acquisition and processing parameters on land, swamp and marine terrains. Our personnel use tested algorithms to remove acquisition induced noises from seismic data starting from the instrument test on the field through brute stack processing to delivery of processed SEG-Y data. We have the power to make several wishes of clients come true. PET areas of quality control include seismic, survey, Health Security, Safety and Environments (HSSE), Community Affairs.

Geotechnical services
The group is experienced to provide geodetic solutions for well locations, geophysical surveys and topographical mapping, Geotechnical survey, Drill borehole, Magnetic & Bathymetric surveys, SPT & electrical CPTE test, Water Table measurement, Resistivity test and sample analyses
PET project management approach is predicated on the Total Quality Management System. In this vain, have in place structures, procedures and processes that will get the job done right at the first try.

Petroleum data evaluation
* Field Development Plan (FDP)
* Well site duties and Postmortem analysis
* AVO & Inversion studies
Our services mirror our long years of professionalism. The probability of drilling a successful well depends to some extent on the reliability of the interpreted dataset. PET has consistently matured the evaluation of critical data necessary to guarantee success.

Pore Pressure Analysis / Geomechanical Modelling
Structural stability tests, well bore stability control, pre-drill mud weight / formation evaluation, post drill analyses, hydrocarbon migration pathway and pore pressure studies.
Critical decisions on geomechanical models (Full stress tensor evaluation, Hydrocarbon trap integrity, Structural stability assessment, Reservoir optimisation and development) are not only data driven but also supported with tested professional practices and sound scientific findings.


Energy Processing and Utilisation
Assessment of hydrocarbon reservoirs and facilities for power generation and domestic gas production. Cost, business model initiation, risk evaluations and project management.



Community Affairs
PET plans and coordinates enlightenment campaign meetings and topography-community survey, which are very necessary when it comes to grasping adequate knowledge of concessional area. Particularly, they become more important for new block owners to sensitize communities in detail and collect requisite information on terrain, road networks, forbidden area, vegetation and social-cultural activities of the people.